City of Tallahassee Electric Utility

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Net Excess Generation Notes

Excess solar energy produced during the daytime typically offsets consumption at your premise at night. Excess power (generated by small to moderate-sized PV units-up to 100 kilowatts) may be returned to the City of Tallahassee Utilities at the full retail value, including taxes.

Rebates Offered
No
Deregulated
No
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
15
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
ConnectDER

Plans & docs

Site Plan Reqs


SLD Reqs


Electric Service Reqs

MAX 15KWAC

PCS NOT ALLOWED

Meter Num Req SLD 3LD
No
ESID Num Req SLD 3LD
No
Electrical Diagram Notes

All Jobs [AC DISCONNECT TO BE INSTALLED ADJCENT TO UTILITY METER WITHIN 10FT AND TO BE VISIBLE, LOCKABLE, LABELED and ACCESSIBLE]

Website
link
Phone
850-891-4968
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Tallahassee Electric Utility before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.