Clewiston Utilities

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The customer will be billed for the total amount of electricity delivered to the home by the utility. The customer will then be credited for the total amount of excess electricity that is generated by the customer and delivered to the utility. In the event that a customer’s credit for its self-generation is greater than its bill for utility electricity, the excess credit amount will be applied to the following month’s bill. The customer’s monthly bill will reflect the net of electricity purchased from the utility versus electricity sold to the utility.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

For inverter-based systems, the AC nameplate generating capacity shall be calculated by multiplying the total installed DC nameplate generating capacity by 0.85 in order to account for losses during the conversion from DC to AC.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) The member needs to be the one to call and request a cutloose/reconnect - we need a 24 hour notice. And will require an inspection receipt from the county before we reconnect. "Permits have to be pulled prior to any work being done (Community Development )


Before we can reconnect service the City Inspector has to check and approve work


We are short staffed so the sooner you can notify us the better that way we can assure no delays"

TDR - Who to Contact Customer Service

TDR - Applications/Documents Req No No

TDR - ETA of notice required for request 24 hours 48 hours

TDR - Who can schedule? Customer Does not matter

TDR - ETA of Utility Scheduling TDR N/A N/A

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

See Plan Sample

SLD Reqs

See Plan Sample

Install Reqs

The manual disconnect switch shall be mounted separate from the meter socket on an exterior surface adjacent to the meter.

Placards

Required

Equipment Approvals
California Energy Commission
Website
link
Phone
(863) 983-1454

Other details

Restrict Inspection
0
Address ID
270875
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Clewiston Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.