FKEC - Florida Keys Electric Cooperative

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Solar Export Type
Fixed kWh
Solar Export Rate
0.03
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
120
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes
For inverter-based systems, the AC gross power rating can be calculated by multiplying the total installed DC nameplate rating by .85 to account for the losses in converting from DC to AC.
Systems should not be sized so large that the energy produced by the array exceeds 120% of the member’s maximum kWh consumption

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
Plans need to be stamped
Website
link
Phone
(305) 852-2431

Other details

Restrict Inspection
0
Address ID
220122
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with FKEC - Florida Keys Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.