GCEC - Gulf Coast Electric Cooperative, Inc.
Net metering & export
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- 0.03072
- Net Excess Generation Notes
The customer’s bill will be calculated by subtracting the credit to the customer from the Cooperative’s charges to the customer. If the credit to the customer is greater than the Cooperative’s charges to the customer, the Customer’s bill shall be zero for the current billing cycle with the difference credited to the Customer in subsequent billing cycles. When the Customer discontinues Net Metering Rider service, any unused credit will revert to the Cooperative.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The nameplate rating of the Member’s generator system must not exceed 25 kW
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR) The member needs to be the one to call and request a cutloose/reconnect - we need a 24 hour notice. And will require an inspection receipt from the county before we reconnect.
TDR - Who to Contact Customer Service
TDR - Applications/Documents Req No
TDR - ETA of notice required for request 24 hours
TDR - Who can schedule? Customer
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
See Sample
- SLD Reqs
On both the agreement and the one-line diagram please make sure the power rating is in AC format and the same on both pages.
See Sample
- Install Reqs
A disconnection device is required between the member’s generator and the inverter at the inverter input circuit. Another disconnect device is required between the inverter and the connection point to the electric grid at the inverter output circuit.
- Rate Schedule Link
- link
- Website
- link
- Phone
- (850) 639-2216
Other details
- Restrict Inspection
- 0
- Address ID
- 117989
- Express Planset Eligible
- Yes