KEYS - Keys Energy Services

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Allowed Meter Adapter
None

Plans & docs

Electric Service Reqs

** Production Meter Required


**AC Disconnect:**


* Manual disconnect switch of the visible load break type to provide a separation point between the AC power output of the Renewable Generation System and any RGS Owner wiring connected to Utility’s system

* The manual disconnect switch shall be mounted separately from the meter socket on an exterior surface adjacent to the meter.

Placards

**AC Disconnect / Meter:**


* Sign at the meter notating the location of the manual disconnect switch to enable utility employees to easily access the disconnect switch.

Rate Schedule Link
link
Website
link
Phone
(305) 295-1080
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with KEYS - Keys Energy Services before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.