Lake Worth Beach Electric Utility

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
Post Solar Billing Method
Net Metering
Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Size Justification
Load Justification
System Offset Notes
  • Load Justification Form required on All projects
  • We only allow installations up to 10KW Max.
  • The system can’t produce more KWH’s than the property consumed for the previous 12 months  
  • The GPR shall not exceed ninety percent (90%) of the Customer’s electric distribution service rating. If the GPR does exceed the ninety percent (90%) limit, the Customer shall be responsible for all costs associated with upgrading the distribution service to ensure the ninety percent (90%) limit is not exceeded.  
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link
Phone
(561) 533-7300
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Lake Worth Beach Electric Utility before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.