PRECO - Peace River Electric Cooperative
Net Metering Allowed1
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 90
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- Allowed Meter Adapter
- None
Plans & docs
- Electric Service Reqs
** System Sizing:**
The RGS shall be rated at no more than 1000 kilowatt (KW) alternating current power output and is primarily intended to offset part or all of the member’s current electrical requirements. The rating of the system cannot exceed 90% of the member’s utility distribution service rating
- Install Reqs
We are on an approved list to pull the meter. However we still need to beforehand and and schedule the meter pull and then call this number afterwards to let them know we are done. And have an inspection within 30 days
- Rate Schedule Link
- link
- Website
- link
- Phone
- 863-773-4116
Other details
- Restrict Inspection
- 0
- Address ID
- 112752
- Express Planset Eligible
- Yes