SVEC - Suwannee Valley Electric Cooperative

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
Post Solar Billing Method
Net Metering
Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The RGS must have a GPR that does not exceed ninety percent (90%) of the Customer's utility distribution service rating at the Customer's location. If the GPR does exceed that ninety percent (90%) limit, the Customer shall be responsible to pay the cost of upgrades for that distribution service to accommodate the GPR capacity and to ensure the ninety percent (90%) threshold is not breached.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Rate Schedule Link
link
Website
link
Phone
(386) 362-2226

Other details

Restrict Inspection
0
Address ID
135307
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with SVEC - Suwannee Valley Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.