Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Talquin Electric Cooperative

Florida Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed1
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate
2.92
Solar Export Rate Approx
0.03
Net Excess Generation Notes

Excess generation credits shall accumulate and be used to offset the members energy usage in subsequent monthly billing cycles for a period of not more than twelve months.


If the electricity consumed by the member during the billing period exceeds the electricity generated by the members RGS during the billing period, then all electricity generated by the members RGS generation shall be deemed to have been used onsite. If the electricity generated by the members RGS during the billing period exceeds the electricity consumed by the member, then the excess NET energy that is delivered to the cooperative shall be credited at the amount published in Rate Schedule QF-1.


At the end of each calendar year, the cooperative shall credit the member of any unused energy credits.


Any system approved before June 2021 will fall under NM-1, which is $0.10 kWh. Systems after will go under NM-2, which is 2.8 kWh. Any excess generation will be applied to the next month bill

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
1
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
0
System Offset Notes

The RGS shall be rated at no more than 1,000 kilowatts {kW) alternating current power output and is primarily intended to offset part or all of the Member's current electrical requirements. The rating of the system cannot exceed 90% of the Member’s utility distribution service rating.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

If you require power interruption for a disconnect tie in for example, you should call in advance and ask for a service representative who will create a service order for the location. Please have the meter number or account number to identify the location.


TDR - Who to

TDR - Applications/Documents Req: No

TDR - ETA of notice required for request: 48 hours

TDR - Who can schedule? : Does not matter

TDR - ETA of Utility Scheduling TDR: N/A

Allowed Meter Adapter
None

Plans & docs

Install Reqs

The manual disconnect switch shall be mounted separately from the meter socket and shall be readily accessible at all times to the Cooperative and shall be capable of being locked in the open position by the Cooperative

Equipment Approvals
California Energy Commission
Rate Schedule Link
link
Website
link
Phone
(850) 627-7651

Other details

Restrict Inspection
0
Address ID
118001
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Talquin Electric Cooperative before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.