Talquin Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate
- 2.92
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
Excess generation credits shall accumulate and be used to offset the members energy usage in subsequent monthly billing cycles for a period of not more than twelve months.
If the electricity consumed by the member during the billing period exceeds the electricity generated by the members RGS during the billing period, then all electricity generated by the members RGS generation shall be deemed to have been used onsite. If the electricity generated by the members RGS during the billing period exceeds the electricity consumed by the member, then the excess NET energy that is delivered to the cooperative shall be credited at the amount published in Rate Schedule QF-1.
At the end of each calendar year, the cooperative shall credit the member of any unused energy credits.
Any system approved before June 2021 will fall under NM-1, which is $0.10 kWh. Systems after will go under NM-2, which is 2.8 kWh. Any excess generation will be applied to the next month bill
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 1
Interconnection & taps
- Approval Req To Install
- No
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
The RGS shall be rated at no more than 1,000 kilowatts {kW) alternating current power output and is primarily intended to offset part or all of the Member's current electrical requirements. The rating of the system cannot exceed 90% of the Member’s utility distribution service rating.
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
If you require power interruption for a disconnect tie in for example, you should call in advance and ask for a service representative who will create a service order for the location. Please have the meter number or account number to identify the location.
TDR - Who to
TDR - Applications/Documents Req: No
TDR - ETA of notice required for request: 48 hours
TDR - Who can schedule? : Does not matter
TDR - ETA of Utility Scheduling TDR: N/A
- Allowed Meter Adapter
- None
Plans & docs
- Install Reqs
The manual disconnect switch shall be mounted separately from the meter socket and shall be readily accessible at all times to the Cooperative and shall be capable of being locked in the open position by the Cooperative
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (850) 627-7651
Other details
- Restrict Inspection
- 0
- Address ID
- 118001
- Express Planset Eligible
- Yes