TECE - Tri-County Electric Cooperative (FL)

Florida Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

If a member generates more energy than they use throughout the year, TCEC will purchase any excess energy generated at Seminole Electric Cooperative's avoided costs, available at https://www.seminole-electric.com/.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

** One-line diagram must show the electrical design of the generating installation, including equipment for interconnection with the Cooperative's system

**Disconnect: **


Must install and maintain a manual disconnect switch to provide a separation point between the AC power output of the RGS and any Customer facilities connected to the Cooperative's electrical system.

Electric Service Reqs

**System Sizing**

The RGS must have a GPR that does not exceed ninety percent (90%) of the Customer's utility distribution service rating at the Customer's location.


If the GPR does exceed that ninety percent (90%) limit, the Customer shall be responsible to pay the cost of upgrades for that distribution service to accommodate the GPR capacity and to ensure the ninety percent (90%) threshold is not breached.

Website
link
Phone
(850) 973-2285
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with TECE - Tri-County Electric Cooperative (FL) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.