Canoochee EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed0
Load Taps Allowed1

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.035
Net Excess Generation Notes

The generated energy fed into the Cooperative's electric grid will be purchased by the Cooperative the avoided cost rate.

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
1
Supply Side Taps Allowed
1
Line Taps Allowed
0
Load Taps Allowed
1
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Meter Spot Process

NOTICE - utility will NOT allow any means of interconnection between the meter and the first means of disconnect.

TDR Process

Contact - staff (x2027)

Notice Req. - 24hr notice preferred, but typically can do same-day

Who can schedule?

Reconnect: must be called before 3PM to have reco completed (5pm is latest they will come out)

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

NOTICE - utility will NOT allow any means of interconnection between the meter and the first means of disconnect

(TEST PROJECT WITH GATEWAY 3 INTERCEPTING UM https://portal./projects/506117/task/10989001)

Website
link
Phone
(800) 342-0134

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
209126
Express Planset Eligible
Yes