Central Georgia EMC
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.04
- Net Excess Generation Notes
The rate used to determine the dollar amount paid for net energy
purchased by the Corporation shall be based upon the Corporation’s
avoided average annual cost of purchased power
TOU Rates
On-Peak Energy $0.170/kWh
Off-Peak Energy $0.036/kWh
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
In order to apply for Net Metering, residential customers cannot exceed 10kW AC
and 100 kW for a commercial application.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR): We do require a Central Georgia EMC employee be present if the meter base will be opened.
TDR - Who to Contact: Customer Service Center at
TDR - Applications/Documents Req: N/A
TDR - ETA of notice required for request: 2-3 days
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR: N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- SLD Reqs
Detailed one-line diagram of the proposed facility
1. all applicable elementary diagrams, major equipment
a. Generators
b. Transformers
c. Inverters
d. circuit breakers
e. protective relays
2. Specifications and/or test reports
Describe the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.)
Line SIde Tap: "For net metering, connections must be made on the customer’s equipment. Local permitting requirements apply."
- Electric Service Reqs
"Installation meets all applicable safety, power quality,
and interconnection requirements established by the National Electrical Code, the
National Electrical Safety Code and the Institute of Electrical and Electronics
Engineers;"
- Install Reqs
"f) In the case of static inverter-connected renewable fuel generators with an
alternating current capacity in excess of 10 kilowatts, the Customer Generator
must have the inverter settings inspected by the Cooperative. The Cooperative
may impose a fee on the Customer Generator of no more than $50 for such
inspection;
g) In the case of non-static inverter-connected renewable fuel generators, the
Customer Generator must interconnect according to the Cooperative’s
interconnection guidelines and the Cooperative must inspect all protective
equipment settings. The Cooperative may impose a fee on the Customer
Generator of no more than $50 for such inspection."
- Website
- link
- Phone
- (770) 775-7857
Other details
- Restrict Inspection
- 0
- Address ID
- 194877
- Express Planset Eligible
- Yes