City of Griffin - Electric Department

Georgia Utility Interconnection & net metering rules

Spot something wrong?

Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.

Report a correction
Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

When electricity generated by the Customer’s distributed generation system exceeds electricity supplied by the Utility, the Customer shall be billed for the customer charges as described in the standard rate for that billing period and credited for excess kWh generated during the billing period at the Utility’s avoided energy cost.

In the event Customer develops a credit balance during a billing period, the amount will remain as a credit on the Customer’s account. Credit balances remaining at the end of the Utility’s fiscal year will be cleared by the issuance of a check for the credit balance to Customer. Any other clearance of account credit balances will be at the Utility’s discretion.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Offset Calc Tool
N/A

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A

Plans & docs

Electrical Diagram Notes


Rate Schedule Link
(pg 35) https://www.cityofgriffin.com/home/showpublisheddocument/1514/638507561213730000
Website
link
Phone
(770) 229-6407