City of Hogansville

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.03
Solar Export Value Notes
For kWh’s generated by Customer’s distributed generation facility, Customer shall be compensated at the City’s avoided cost of energy (kWh) as determined by the City. The City will only comp
Rebates Offered
0
Deregulated
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

PV > Inverter > AC Disco > PM > MSP > UM

Electric Service Reqs

Breaker:

  • The Customer’s over-current protective device (Breaker) at the service panel must be dedicated and must be capable of interrupting the maximum available fault current. The Breaker shall be clearly marked to indicate power source and connection to the City’s electric system.


AC Disconnect:

  • Manual, lockable, load-break disconnect switch that provides a clear indication of the switch position must be available
  • The City will approve the location of the disconnect switch.
  • The disconnect switch must be easily visible, mounted separately from the metering equipment, readily accessible to the City personnel at all times, and capable of being locked in the open position with the City’s lock.
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(706) 637-8629

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
209735
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Hogansville before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.