City of LaGrange
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The City may at its sole option, unless otherwise required by Georgia Law, subtract metered Excess Energy from energy used by the Service Location for billing purposes or credit customer for Excess Energy at a separate rate
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Single-phase and residential PV Systems are allowed at power levels up to 10 kWac. Commercial PV Systems are allowed at a size up to 125% of the Owner’s peal KWac demand.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard
- Electric Service Reqs
Physical Isolation Requirements - the city has two options, listed below:
Installation of a disconnect switch.
- Device shall be located adjacent to, and on the same wall as the location meter.
- Must be labeled per the current version of the NEC
Utilization of the NET meter
- Utilization of the net meter as the physical isolation by allowing city employees to remove the net meter any time the physical isolation of the PV system is required.
- Placards
Refer to the latest NEC code for placard requirements. AC Disconnect must be labeled per NEC
- Electrical Stamp Required
- No
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No