City of Thomasville

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

When electricity supplied by Thomasville Utilities exceeds electricity generated by the customer's distributed generation, the electricity shall be billed by Thomasville Utilities in accordance with the tariff.

When electricity generated by the customer's distributed generation system exceeds electricity supplied by Thomasville Utilities, the customer shall be billed for appropriate customer charges for that billing period and credited for excess kWh generated during the billing period at avoided energy cost, with this kWh credit appearing on the bill for the billing period.

Rebates Offered
0
Deregulated
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Combination
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC disconnect must be accessible to the utility 24/7
  • Production meter required
SLD Reqs
  • Must include all major equipment including, but not limited to, generators, inverters, circuit breakers, and protective relays.
  • AC disconnect required
  • Production meter required
  • A sample line diagram is available in the database files.
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Website
link
Phone
(229) 227-7001

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
210212
Express Planset Eligible
No
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with City of Thomasville before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.