Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
TOU Utility
No
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04877
Net Excess Generation Notes

Whenever the electricity generated by the Member’s distributed generation system exceeds the Member’s consumption, the Member shall be billed under residential tariff RS-8 for the Basic Facilities Charge for that billing period and credited for excess kWh generated during the billing period at Avoided Energy Cost, with this kWh credit appearing on the bill for the billing period. 

In the event a Member develops a credit balance during a billing period, the credit balance will be applied to the next month’s billing charges.

Rebates Offered
No
Deregulated
Yes
Allows Standby
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The system is intended primarily to offset part or all of the Member generator’s requirements for electricity.

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-Disco-PM-POI
Production Meter Labeling
Production Meter
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Production Meter is required. Inv > AC > top of PM > POI

AC disconnect must be located outside as close to the utility meter meter as possible (6 ft max)

SLD Reqs

. If your system varies from requirements, attach a detailed one-line diagram of the proposed system including POI. Show electrical rating and operating voltages of service panel, disconnect switch, inverters, generators, circuit breakers, etc.


Customer installs the PM base. Utility installs the PM head.

Inv > AC > top of PM > POI

Production Meter must be wired TOP SIDE solar


Utility will accept multiple PV meters on site. This can be leveraged if we need to split up systems for ESS for example.

Electric Service Reqs

Customer must provide verification that the system is certified and in compliance with Underwriter’s Laboratory UL 1741 standards as “Utility Interactive” (or induction system standards). Installation should be done to NEC standards. Production meter, as well as clearly labeled disconnects, are required.

Install Reqs

Production Meter is required. Utility provides the PM base. It can be picked up from either Coastal office. Inv > AC > top of PM > POI.. Installation should be done to NEC standards. Production meter, as well as clearly labeled disconnects, are required.

Placards


Equipment Approvals
California Energy Commission
Website
link
Phone
(912) 884-3311

Other details

Revision Required
No
Mod Swap Requires Planset
Yes