Coastal Electric Cooperative (GA)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.04877
- Net Excess Generation Notes
Whenever the electricity generated by the Member’s distributed generation system exceeds the Member’s consumption, the Member shall be billed under residential tariff RS-8 for the Basic Facilities Charge for that billing period and credited for excess kWh generated during the billing period at Avoided Energy Cost, with this kWh credit appearing on the bill for the billing period.
In the event a Member develops a credit balance during a billing period, the credit balance will be applied to the next month’s billing charges.
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
The system is intended primarily to offset part or all of the Member generator’s requirements for electricity.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Process
TDR Process If you determine that you need the home's revenue meter removed or power disrupted, you may call our main office number and speak to anyone in customer service to schedule this outage.
TDR - Who to
TDR - Applications/Documents Req No docs required
TDR - ETA of notice required for request No ETA given
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR No ETA given
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Production Meter is required. Inv > AC > top of PM > POI
AC disconnect must be located outside as close to the utility meter meter as possible (6 ft max)
- SLD Reqs
See "Design - Sample Line Diagram" in Files section of this page. If your system varies from requirements, attach a detailed one-line diagram of the proposed system including POI. Show electrical rating and operating voltages of service panel, disconnect switch, inverters, generators, circuit breakers, etc.
Customer installs the PM base. Utility installs the PM head.
Inv > AC > top of PM > POI
Production Meter must be wired TOP SIDE solar
Utility will accept multiple PV meters on site. This can be leveraged if we need to split up systems for ESS for example.
- Electric Service Reqs
Customer must provide verification that the system is certified and in compliance with Underwriter’s Laboratory UL 1741 standards as “Utility Interactive” (or induction system standards). Installation should be done to NEC standards. Production meter, as well as clearly labeled disconnects, are required.
- Install Reqs
Production Meter is required. Utility provides the PM base. It can be picked up from either Coastal office. Inv > AC > top of PM > POI. See "Design - Sample Line Diagram" in Files section of this page. Installation should be done to NEC standards. Production meter, as well as clearly labeled disconnects, are required.
- Placards
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (912) 884-3311
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 209137
- Express Planset Eligible
- No