Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Coweta-Fayette EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.0375
Solar Export Value Notes
per kWh
Net Excess Generation Notes

Production that exceeds the customers' monthly usage will be credited at the Excess Generation Rate.

The monthly administrative fee is $4.00, added to the $20 service charge

If there is an excess of kilowatts used per billing cycle, they are purchased at an avoided cost of $.0296 cents per kilowatts

Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria

Line Side taps allowed but not in meter can.

Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

The capacity of distributed generation facilities used by residential members shall not exceed 10 kW. The capacity of distributed generation facilities used by non-residential members shall not exceed 100 kW.

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Meter Spot Process

Customer may begin parallel operation of generation facility after our visual inspection and sign off, at which time Coweta-Fayette EMC will then

schedule the installation of a bi-directional meter.

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

A single-line diagram is required showing the Customer’s installation of its generating facilities and the interconnection to Coweta-Fayette EMC’s system. Devices such as the service panel, disconnect switch, inverters, all generators, circuit breakers, etc. must contain the electrical rating and operating voltages.


Line Side taps allowed but not in meter can.

Website
link
Phone
(770) 502-0226

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
194996
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Coweta-Fayette EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.