Net Metering AllowedYes
NEM TypeMonthly
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Monthly
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.2
Net Excess Generation Notes

The customer’s revenue meter will read the import of electrical energy (kWh) from Dalton Utilities and the export of electrical energy (kWh) from the customer’s generation facility. At the end of each billing cycle, the two readings will produce a single net energy value (kWh).

If the resulting net energy value is positive, indicating electric energy imports were greater than electric energy exports, the cost of the net electric energy imports will be calculated based on the customer’s existing electric rate tariff.

If the resulting net energy value is negative, indicating electric energy exports were greater than electric energy imports, the additional energy supplied by the customer may be purchased at an avoided cost determined by Dalton Utilities. Dalton Utilities may continue to purchase power from the customer at the above mentioned avoided cost until Dalton Utilities’ purchased power is equal to 0.2% of the previous year’s peak demand, at which point power may continue to be purchased from the customer at a separate rate agreed upon by the customer and Dalton Utilities.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
No

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Website
link
Phone
(706) 278-1313