Georgia Power

Georgia Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeN/A
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
N/A
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

RNR-Instantaneous Netting:

  • All Excess Energy will be credited at the Solar Avoided Energy Cost, summed monthly, and then used to reduce the customer’s total monthly bill.
  • Rate changes year to year.
  • Customers will be paid out per kW they produce rather than matching energy production to energy consumption.

Energy Offset Only: 

  • Customers will not receive any credit for generation that is exported.
Rebates Offered
0
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
2
Supply Side Taps Allowed
1
Line Taps Allowed
1
Load Taps Allowed
1
Tap Criteria
  • Tap boxes not allowed
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
1
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Utility Specific Adjustments

Goodleap Projects: (Including Battery)

  • Goodleap has a 10kw AC limit - regardless of PV only or Backup
  • Goodleap systems with TPW3 we will require AC coupling to limit the AC size to 10kw.
  • Since TPW3 has a 7.6kw AC limit each - the max inverter we can use with it is a 7.6kw. (If we are using two TPW3 or a TPW3+Xpac we can use a single SE10k inverter)
  • If the system size exceeds a 7.6k inverter (with one TPW3), we can do split pv system with 5.7k string on the TPW3, and 3.8k upstream of the gateway.
  • No PCS or curtailment will be accepted.
  • Existing systems are now DQ from Goodleap if sold after November 1, 2025.

 

All other finances can build AS SOLD

System Offset Notes


Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Meter Spot Required
1
Meter Spot Process
  • If meter pull/TDR is required, call DROP LINE hit option 1 to request a work order to be created for approval to have meter pulled.
  • There will be a 3-business day turn around for approval, and date and time will be provided for Utility tech to go pull meter.
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

All Jobs:

  • Add a note specifying the POI
  • AC disconnect must be within 10' of utility meter.
SLD Reqs

All Jobs

  • NO METER CAN TAPS

Existing Systems

  • Show total system AC and DC capacity (existing and new)

Battery Projects

  • Label the open transmitter relay in the MID device (add leader pointing to relay switch)
  • Add a note PV SYSTEM IS “NON-EXPORTING” If AC System Size > 10 KW
Install Reqs

All Jobs:

  • Do not place system in Stand-by Mode. Leave Inverter on, and the turn the AC disconnect off.
  • This Utility's inspectors will test the system, and if they cannot remove Stand-by they will fail the Witness Test.
Electrical Stamp Required
0
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Electrical Diagram Notes

All Jobs [AC disconnect is 24/7 accessible to GP // 30’ wide access route for entirety of ICF Site; 15’ of clearance on all sides around transformer.]

Website
link
Phone
(888) 660-5890

Other details

Restrict Inspection
0
Revision Required
0
Mod Swap Requires Planset
1
Address ID
299266
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Georgia Power before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.