Hart EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
1
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The purchase rate for a DG facility rated 10kW or less as of the effective date of this Rider is: All kWh $0.060 per kWh. The purchase rate for a DG facility rated greater than 10kW up to 100kW as of the effective date of this Rider is: All kWh $0.035 per kWh

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

Hart EMC will provided the bi-directional meter and Hart EMC will conduct the meter change after the inspection of the site.

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

Site Information, Solar Array Information, Disconnect Locations, Wiring Sizes.

Website
link
Phone
(800) 241-4109

Other details

Restrict Inspection
0
Address ID
202635
Express Planset Eligible
Yes