Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Jefferson EMC

Georgia Utility Interconnection & net metering rules
Net Metering Allowed0
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Other
Solar Export Value Notes
$0.0547 per kWh
Net Excess Generation Notes

All kWh delivered by the cooperative to the DG Owner/Operator shall be billed on the rate charged to the member under the applicable standard rate schedule.

All kWh received from the customer on an instantaneous basis (Excess Net Energy) will be credited on a monthly basis by the cooperative to the member per JEC’s Net Metering Service Schedule NM. Excess Net Energy cannot be "banked," "saved," or "rolled forward" for use in a future month or different time period or interval within a month.

Rebates Offered
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Net energy metering services for peak generation capacity of not more than 10 kW AC for a residential application and 100 kW for a commercial application.

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Meter Spot Process

Temporary Disconnect Reconnect Process (TDR) To get a TDR you can call in and request that with any member service representative a few business days prior. It may require county approval before service can be reconnected.

TDR - Who to

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 2 business days

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

SLD Reqs

1. Visible break disconnect shall be adequately sized for the installation and of load break type.

2. Visible break disconnect shall be readily accessible, located outside within 5 feet of the meter. It shall have a means to be locked in the open position by JEC personnel.

3. Installation shall meet all applicable NEC and local codes.


No Production Meter Required

Site Plan Notes

All Jobs [Visible Lockable AC disconnect located within 10' of utility meter]

Electrical Diagram Notes

All Jobs [Visible Lockable AC disconnect located within 10' of utility meter]

Website
link
Phone
(706) 547-2167

Other details

Restrict Inspection
0
Address ID
195019
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Jefferson EMC before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.