Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Solar Export Rate Approx
0.04
Net Excess Generation Notes

If the electricity consumed by the Member Generator at any point during the billing period exceeds the electricity generated by the Member’s distributed generation facility at the same point in time, then all electricity generated by the Member generator shall be deemed to have been used by the Member. If the electricity generated by the Member’s distributed generation facility at any point during the billing period exceeds the electricity consumed by the Member Generator at the same point in time, then such excess net energy shall be purchased by the Cooperative as All kWh $0.040 per kWh

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
10
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Visible Lockable Labeled Disconnect
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

All major electrical equipment that is pertinent to understanding the normal and contingency operations of the Member Generator’s DG Facilities, including generators, switches, circuit breakers, fuses, protective relays and instrument transformers.

Website
link
Phone
(478) 982-4722

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
202682
Express Planset Eligible
Yes