Sawnee EMC
Net Metering Allowed1
NEM TypeMonthly
Line Taps Allowed0
Load Taps Allowed1
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
For all Cooperative members who have a Distributed Generation Facility interconnected with the Cooperative on or before January 1, 2024, Excess Net Energy will be settled on a monthly basis and for all Cooperative members who have a Distributed Generation Facility interconnected with the Cooperative on or after January 2, 2024, Excess Net Energy will be settled instantaneously.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Line Taps Allowed
- 0
- Load Taps Allowed
- 1
- Tap Criteria
Load side tap allowed IF the service is a meter/main combo
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
• We need the point of common coupling listed on the SLD and site plan.
- SLD Reqs
- The point of common coupling listed on the SLD and site plan.
Battery
- Battery systems require their own AC disconnect or an AC disconnect must be in place between Gateway and meter.
- Placards
Add Electrical Shock Warning placard to the meter base
- Website
- link
- Phone
- (770) 887-2363
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 195020
- Express Planset Eligible
- Yes