Southern Rivers Energy
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Net Excess Generation Notes
When the energy generated by the member's DG system exceeds the amount supplied by SRE, it will be purchased by SRE at its avoided Oglethorpe Power cost.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Temporary Disconnect Reconnect Process (TDR): Call southern Rivers 1-3 days in advance to schedule the temporary disconnect.
TDR - Who to Contact: Customer service
TDR - Applications/Documents Req: N/A
TDR - ETA of notice required for request: 1-3 Days
TDR - Who can schedule? Forever
TDR - ETA of Utility Scheduling TDR: 1-3 Days
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Install Reqs
"In the event the Cooperative at any time in the future changes primary voltage of facilities serving the DG facility such that metering equipment, transformers and/or any other Member-owned equipment must be changed to continue receiving service at the new primary voltage level, the full cost of the change will be borne by the Member.
In all cases, the Member shall pay the full cost of the installation of a load break disconnect switch by and to the sole specification of the Cooperative. The switch shall be readily accessible to Cooperative personnel and of a type that will provide a visible air gap when in the open position and can be secured in an open position by a Cooperative lock.
The Member shall install a load break disconnect switch at the Member’s expense and to the Cooperative’s specifications.
The switch will be located so as to be readily accessible to Cooperative personnel in a location acceptable to both the Member and Cooperative.
The switch shall be a type that will provide a visible air gap when in the open position and can be secured in an open position by a lock owned by the Cooperative. If the Cooperative has locked the disconnect switch open, the Member shall not operate or close the disconnect switch.
"
- Equipment Approvals
- California Energy Commission
- Rate Schedule Link
- link
- Website
- link
- Phone
- (770) 358-1383
Other details
- Restrict Inspection
- 0
- Address ID
- 209381
- Express Planset Eligible
- Yes