Tri-State EMC
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.02
- Solar Export Value Notes
- Super Peak kilowatthours per month at 2.188 cents per kWh. On Peak kilowatthours per month at 2.137 cents per kWh. Off Peak kilowatthours per month at 1.895 cents per kWh. Super Off Peak kil
- Net Excess Generation Notes
Power purchased through Tennessee Valley Authority. Electricity produced serves the facility's needs first. TVA purchases any excess generation that is delivered to the grid. If the facility needs additional electricity, it must be bought from the local power company. Bi-directional meter that is capable of recording kW/kWh received from the local power company and delivered to the power grid on separate channels is required.
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Website
- link
- Phone
- (706) 492-3251