Washington EMC (GA)
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
The solar system's kWh will reduce the amount of kWh that Washington EMC bills the customer for. If the electricity consumed by the Customer Generator during the billing period exceeds the electricity generated by the customer’s distributed generation facility during the billing period, then all electricity generated by the customer generation shall be deemed to have been used by the Customer Generator. If the electricity generated by the customer’s distributed generation facility during the billing period exceeds the electricity consumed by the Customer Generator, then such excess net energy shall be purchased by the Corporation as provided under the Avoided Cost rate. The Corporation will purchase energy from Customer Generators on a first-come, first served basis only until the cumulative generating capacity of all the Customer Generators’ renewable resources equals 0.2 percent of the Corporation’s annual peak demand in the previous year.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 1
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
The utility has confirmed 10 kW AC is the max system size allowed as well as combined systems cannot exceed 10 kW AC
- Inverter Oversize Restrictions
- 0
- System Offset Notes
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect must be accessible to the utility 24/7
- SLD Reqs
- AC disconnect: visible load break disconnect switch
- The diagram shall include at a minimum, all major electrical equipment that is pertinent to understanding the normal and contingency operations of the Customer Generation Interconnection Facilities.
- Install Reqs
- The outside disconnect must be left off, and the homeowner must know how to operate the system for the utility witness test. The witness test is required for Permission to Operate.
- Placards
- Signage shall be required by the Cooperative at the Member’s expense and located at the disconnect indicating the purpose of the switch along with contact names and numbers of both the Member and the Cooperative.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (478) 552-2577
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 209541
- Express Planset Eligible
- Yes