Solar Sanity Checksolar, decoded Independent. Nothing you type leaves your browser.

Burley Municipal

Idaho Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes
On the months where the customer’s usage has exceeded the available credits they will get billed that month for their electrical usage. Future credits cannot be applied to current monthly bill/usage. Once electricity has been delivered to the customer by the utility they must pay for it on the city’s regular billing cycle. On April First of each year of operation (full or partial), the NET meter will be reset to zero and all unused credits will expire. There is to be no payment back to the customer for excess credits at this time.
Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Inverter Oversize Restrictions
1
System Offset Notes
Members are allowed to connect up to 25kW of generation
Offset Calc Tool
PV Watts

Metering & disconnect

Meter Spot Process
TDR Process We ask that the week prior to the work being done that you notify us and the day before the work will be preformed you confirm that the work is still on schedule. For reconnect about 30min prior to reconnect call us. You can contact me to do this at or the office at . No fees unless the disconnect/reconnect are scheduled by you for after hours.
TDR - Who to Contact staff
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 7 days
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
Would like to see the building and where everything will be placed.
SLD Reqs
Simple diagram showing how things are connected.
Install Reqs
We don't require a production meter, but if the main panel and or meter base are replaced we do require a ringless meter base and outside disconnect be installed.
Equipment Approvals
California Energy Commission
Website
link
Phone
(208) 878-2538

Other details

Restrict Inspection
0
Address ID
283556
Express Planset Eligible
Yes