City of Weiser Electric Department
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedNo
Load Taps AllowedNo
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Currently, the utility does 1:1 net metering, any excess kWh will rollover to the next month, indefinitely. They will never buy excess kWh, so if they closed out their account the remaining kWh will be voided. Tariff may change around Spring 2023 or Summer 2023
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Up to 25 kW - but the utility prefers a 100% offset but not required; if the project will trigger a transformer upgrade, we'll need to downsize the system
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (208) 414-1965
Other details
- Revision Required
- No
- Mod Swap Requires Planset
- No