Fall River Rural Electric

Idaho Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeMonthly
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Monthly
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

With the current net metering rate, members get a one-for one credit up to what they used on a monthly basis. Excess energy gets paid out at average wholesale power costs as a credit on the account for future needs.

Rebates Offered
0
Deregulated
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
25
System Size Restriction Type
DC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Members are allowed to connect up to 25kW of generation

Offset Calc Tool
PV Watts

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Meter Spot Process

TDR Process Fall River Electric will disconnect and reconnect any service supplying member-owned service equipment that must be de-energized prior to modification. There will be no charge for the disconnection if done during normal work hours. The reconnection will be done without charge if it can be completed on the initial trip or on a second trip scheduled during regular working hours, and at Fall River’s convenience; otherwise, the member will be billed a reconnection charge according to the fee schedule then in effect. Any modifications to metering equipment will require a state electrical inspection. Fall River Electric cannot reconnect unless the modifications have been certified by the State. (For your safety, only authorized Fall River Electric representatives will disconnect or reconnect facilities.)

TDR - Who to Contact Customer Service

TDR - Applications/Documents Req N/A

TDR - ETA of notice required for request 2 days

TDR - Who can schedule? Does not matter

TDR - ETA of Utility Scheduling TDR N/A

Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • A site map is required to show the location of all the components
  • AC Disconnect to be within 10' of the members side of the meter
SLD Reqs


Install Reqs

If you are installing a system on an existing Fall River Electric Service there should be an existing Fall River Electric Meter.

See Guidelines for Installation

Placards

Placards required by NEC

Equipment Approvals
California Energy Commission
Electrical Diagram Notes

All Jobs [AC Disconnect switch to be within 10' of the members side of the meter]

Rate Schedule Link
link
Website
link
Phone
(208) 652-7431

Other details

Restrict Inspection
0
Address ID
283575
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Fall River Rural Electric before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.