Idaho Falls Power
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
If the electricity generated by the Customer-Generator exceeds the electricity supplied by IFP during the billing period the Customer-Generator: (a) Shall be billed for the applicable non-energy charges for the billing period under the Customer's appropriate rate classification; (b) Shall be financially credited for the excess energy delivered to IFP during the billing period, at the rate adopted in ordinance for the corresponding period. Idaho Falls Power buys that excess power from the customer at the current fluctuating market rate.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
Customer contacts Idaho Falls Power to obtain size limitations of their on-site generation system
Per Idaho Falls Power Service Policy, customer owned generation facilities shall have a maximum annual generation capacity of no more than the previous 12 months of electric usage.
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
Idaho Falls Power installs a net meter for solar installations. Customers can install a separate meter in their system if desired.
TDR Process Call utility to schedule TDR
TDR - Who to
TDR - Applications/Documents Req N/A
TDR - ETA of notice required for request 24 hours
TDR - Who can schedule? Does not matter
TDR - ETA of Utility Scheduling TDR N/A
- Allowed Meter Adapter
- ConnectDER
Plans & docs
- Site Plan Reqs
Shows design and components
- SLD Reqs
Standard one line diagram for solar projects. One-Line Drawings, with design and components list
- Electric Service Reqs
- Install Reqs
An approved meter base is required for the net meter. If the customer installs a separate meter in their system that will fall under the jurisdiction of the city electrical inspector.
- Placards
Placards required by NEC
- Equipment Approvals
- California Energy Commission
- Website
- link
- Phone
- (208) 612-8430
Other details
- Restrict Inspection
- 0
- Address ID
- 274865
- Express Planset Eligible
- Yes