Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed1
Line Taps Allowed1
Load Taps Allowed1
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 1
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
- For customers purchasing energy from ComEd at fixed-prices, net metering credits are measured in kWh and used to reduce energy supply and other kWh-based charges. Net metering credits carried over from prior billing periods can be used to reduce future energy supply and other kWh-based charges until the end of the annual period specified on the Net Metering Election Form.
- For customers purchasing energy from ComEd at hourly prices, net metering credits are based on the price of power during the hours excess energy is produced and are reflected as a monetary credit on your energy bill.
- Rebates Offered
- 1
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 1
- Supply Side Taps Allowed
- 1
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Tap Criteria
- Lineside Taps are approved inside meter cans for PV-Only projects (We cannot tap in the meter can on battery projects, unless it uses a Tesla Backup Switch)
- Meter can needs to be an 8" x 12" size in order to house the tap
- Taps also allowed on underground pedestal-style meters
- If the meter can is ringed, or if it is a stand-alone meter with no can, a meter upgrade will be required. If we replace the meter can then it needs to be ringless
Battery Projects
- Tesla Backup Switch is Allowed
- Design with backup switch only. If a gateway is required, provide an explanation in the design notes
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Utility Specific Adjustments
- If the customer does not have 12 months of consecutive usage, the system will need to be sized using the Delivery Service Class chart. See "Commonwealth Edison SOP" in Files section on this page.
- Inverter Oversize Restrictions
- 1
- Restriction Percent
- 150
- System Offset Notes
- Offset Calc Tool
- PV Watts
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Meter Spot Required
- 0
- Meter Spot Process
None required
- Meter Adapter Requirements
- Allowed Meter Adapter
- ConnectDER,Tesla Backup Switch
Plans & docs
- Site Plan Reqs
All Projects
- Plans must exactly match the account holder's name and service address on the utility bill - All pages of the plan set (including Unit #)
- ComEd will not kickback based on AC Disco labeling per staff.
Battery
- Battery model has to be specified for SEEB and PW3 - (ex. UBAT-10K1PS0B-03)
- SLD Reqs
All Projects
- Inv > AC Disco > POI
- 10kW to 25kW systems registered with GATS must utilize a meter that meets ANSI C.12 standards. Certified, refurbished meters are allowed.
- See file: Electrical in Illinois for guidelines on creating plans.
- Rigid Conduit (IMC) is required
- ComEd will not kickback based on AC Disco labeling per staff.
Battery
- Tesla Backup Switch is Allowed - Please remove the verbiage "METER ADAPTOR" on the SLD next to the Backup Switch - DESIGN WITH BACKUP SWITCH ONLY, DO NOT USE THE GATEWAY UNLESS ABSOLUTELY NECESSARY, AND LEAVE NOTES AS TO WHY.
- For SEEB, Battery model has to be specified - UBAT-10K1PS0B-03
- Electric Service Reqs
- Roof plates used as service attachments are no longer supported by ComEd.
- All service revisions will require an exterior emergency disconnect and whole-home surge protection.
- Install Reqs
- See "DER Interconnection Guidelines for Customers" in the Files section of this page.
- Electrical Stamp Required
- 0
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Site Plan Notes
- Label Page Notes
- Cover Page Notes
- Electrical Diagram Notes
- Rate Schedule Link
- link
- Website
- link
- Phone
- (630) 576-8158
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 108080
- Express Planset Eligible
- Yes