IL - Adams Electric Cooperative
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Fixed kWh
- Net Excess Generation Notes
If the eligible member is a net seller of electricity during the billing period, the cooperative will calculate a monetary credit for any metered excess kilowatt-hours of electric energy (kWh) delivered to the cooperative at a rate equal to the HMEV corresponding to the billing period and apply such credit against only the electric Policy Bulletin No. 35 Page 4 energy charges derived specifically from the consumption of electric energy (kWh) measured in units of kilowatt-hours as denoted on a subsequent bill for service to the eligible member.
The cooperative shall continue to carry over any unused amount of such credits and apply those credits to subsequent billing periods to offset only any electric energy (kWh) charges derived specifically from the consumption of electric energy (kWh) measured in units of kilowatt-hours due from the eligible member as denoted in the billing for those subsequent billing periods until all credits are used or until the end of the annual period, whichever occurs first.
At the end of the annual period that service is supplied by means of net metering, or in the event that the eligible member terminates service with the cooperative during an annual period, any remaining credits in the eligible member’s account shall expire and no credit or payment shall be due to the member for such expired credits.
If the member has a two-meter electric heating and/or cooling rate, the rate must change to a single-meter electric rate.
- Rebates Offered
- 0
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 1
- System Size Includes Existing Systems
- 1
- Offset Type
- Combination
- Offset Value
- 110
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Visible lockable AC disconnect must be installed immediately adjacent to the meter base.
- SLD Reqs
Visible lockable AC disconnect must be installed immediately adjacent to the meter base.
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Electrical Diagram Notes
- Website
- link
- Phone
- (217) 593-7701
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 1309205
- Express Planset Eligible
- Yes