Jo-Carroll Energy (IL)
Net metering & export
- Net Metering Allowed
- 0
- NEM Type
- N/A
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Value Notes
- Information updated monthly: https://jcecoop.com/solar-pv
- Net Excess Generation Notes
Export Rate: utility will credit customer for each kWh they exported at avoided cost.
In the Geneseo area where power is supplied by Prairie Power Inc. (PPI), members installing solar PV arrays can only take advantage of avoided cost. Net metering is no longer available for new systems in JCE Co-op’s Geneseo service area. This avoided cost rate in the area served by PPI is set annually in January. For 2025 it is $0.0369500/kWh returned.
In the northern areas of our service territory where power is supplied by Dairyland, new applications after March 31, 2025 can only take advantage of avoided cost. Net metering is no longer available for new systems. This avoided cost rate in the area served by Dairyland is set monthly. The rate set in March 2025 is $0.02811.
- Rebates Offered
- 1
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 1
- Load Taps Allowed
- 1
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Percentage
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Must show proposed location of the DG system/DG Disconnect and show directory placard
- SLD Reqs
One Line Diagram showing POT and all the following information at a minimum:
- Transformer size feeding the meter
- Meter form, voltage, class, phase and method of interconnection - If the meter has CTs and/or PTs denote that next to the meter.
- Any generators
- Any transfer switches, automatic of manual.
- Denote the size of the PV disconnects and overcurrent protective devices.
- Inverter and Panel types
- If interconnecting by line tapping between the meter and the MSP (supply-side connection) denote the type of connectors being used to do so.
- If interconnecting through the MSP (load-side connection), denote the size of the breaker that is being connected to.
- Electric Service Reqs
AC Disconnect
- Placards
Locational and appropriate warning label placard required
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (800) 858-5522
Other details
- Restrict Inspection
- 1
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 3454153
- Express Planset Eligible
- Yes