MJM Electric Cooperative
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
Excess power will be credited at the avoided cost rate and may be used towards the Power Supplier Energy Charge. Any excess generation credits left at the end of the Annual Billing Period will expire. Member will not be eligible for any incentive rates after installation of generation system such as our Electric Heat Discount.
- Rebates Offered
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Max system size 24kW
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- AC Disconnect Required
- Yes
Plans & docs
- SLD Reqs
Please see document in files section for SLD format
- Website
- link
- Phone
- (217) 707-6156
Other details
- Restrict Inspection
- 0
- Address ID
- 785091
- Express Planset Eligible
- No