Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Excess power will be credited at the avoided cost rate and may be used towards the Power Supplier Energy Charge. Any excess generation credits left at the end of the Annual Billing Period will expire. Member will not be eligible for any incentive rates after installation of generation system such as our Electric Heat Discount.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

Max system size 24kW

Metering & disconnect

Production Meter Required
Yes
Production Meter Position
Inv-PM-Disco-POI
AC Disconnect Required
Yes

Plans & docs

SLD Reqs

Please see document in files section for SLD format

Website
link
Phone
(217) 707-6156

Other details

Restrict Inspection
0
Address ID
785091
Express Planset Eligible
No