Monroe County Electric Cooperative
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.0363
- Net Excess Generation Notes
• The Co-operative will install and maintain metering equipment capable of measuring the flow of electricity both into and out of the member’s facility at the same rate and ratio. If member’s existing meter is not capable of meeting this requirement, or if the member requests an additional meter, the cost of installing and maintaining same shall be paid by the member.
• For EREGFs with a nameplate rating less than 40 kW, the Co-operative shall compensate the eligible member for any excess kWh credits at the Co-operative’s Avoided Energy Cost of electricity supply (currently $0.0363/kWh) over the monthly periods.
• The Co-operative shall provide Net Metering to eligible members until the load of its Net Metering members equals 1% of the total peak demand supplied by the Co-operative during the previous year. The Co-operative may in its sole discretion offer Net Metering beyond the 1% level. The Cooperative reserves the right to discontinue the offer of this policy at any time after a six month notice of the Co-operative’s intent to discontinue.
- Rebates Offered
- 1
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 40
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- Site plans must show the location of the main meter, disconnect, inverter, batteries, and generation source.
- The member’s equipment must contain a disconnect device to which the Cooperative has access and which the Cooperative can lock in an open position to disconnect, for safety reasons, the member’s electric generating facility from the Cooperative’s electric delivery system.
- SLD Reqs
- Electric Service Reqs
- Part of the inspection on the day of commissioning may include the member’s existing meter base. Please note that MCEC will not approve a DG system if code violations are found in a meter base during the meter change. For example, multiple wires installed in one lug.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (618) 939-7171
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1705137
- Express Planset Eligible
- Yes