Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Energy generated by the customer-owned generator during the billing period may supply all or a portion of the energy required by the customer’s load. The customer shall be credited for excess energy delivered by the customer to RMU at the meter from the approved on-site generating facility.

For any energy generated by the customer in excess of the energy required by the customer’s loads for a given billing period a credit shall be carried forward to the customer’s next billing period.

RMU shall carry over any unused credits earned and apply those credits to subsequent billing periods to offset usage based electric energy (kWh) charges only for electric energy supplied to the customer by RMU until all credits are used or until the end of the annual period. The annual period shall end each year on December 31.

Rebates Offered
No

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
No
Line Taps Allowed
No
Load Taps Allowed
No
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
  • Sizing must be within 36 months of the customer's historical usage
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC disconnect must be accessible to the utility 24/7
SLD Reqs
  • A safety manual disconnect switch of the visible load break type must be installed