Rochelle Municipal Utilities

Illinois Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Energy generated by the customer-owned generator during the billing period may supply all or a portion of the energy required by the customer’s load. The customer shall be credited for excess energy delivered by the customer to RMU at the meter from the approved on-site generating facility.

For any energy generated by the customer in excess of the energy required by the customer’s loads for a given billing period a credit shall be carried forward to the customer’s next billing period.

RMU shall carry over any unused credits earned and apply those credits to subsequent billing periods to offset usage based electric energy (kWh) charges only for electric energy supplied to the customer by RMU until all credits are used or until the end of the annual period. The annual period shall end each year on December 31.

Rebates Offered
0

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes
  • Sizing must be within 36 months of the customer's historical usage
Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs
  • AC disconnect must be accessible to the utility 24/7
SLD Reqs
  • A safety manual disconnect switch of the visible load break type must be installed
Website
link
Phone
(815) 562-4155

Other details

Address ID
1171011
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Rochelle Municipal Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.