SEIEC - SouthEastern Illinois Electric Cooperative, Inc
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Annual
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
In the event the delivered credits exceed the consumed charges, the credit will apply to member’s account and apply to the next billing period. In the event the delivered credits exceed the consumed charges on a regular and consistent basis and the account continues to accumulate credits, the Cooperative will pay the amount of the credit to the member at the end of the last billing period per calendar year.
- Rebates Offered
- 0
- Deregulated
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
Namplate Rating up to 40kW
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Meter Spot Process
"For a temporary disconnect, simply have the owner call in with the date and time for the disconnect. Obviously, an address and/or meter number will speed of the process.
There is not a fee, but the reconnect needs to be called in before 2pm to avoid overtime charges. Please give us as much notice as possible to schedule the temp disconnect.
If there is inclement weather, the disconnect may not be completed until after the weather has passed."
TDR - Who to
TDR - Applications/Documents Req: No
TDR - Who can schedule? Customer
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
See SLD Sample. Detailed one-line diagram of the proposed facility, all applicable elementary diagrams, major equipment, (generators, transformers, inverters, circuit breakers, protective relays, etc.) specifications, test reports, etc., and any other applicable drawings or documents necessary for the proper design of the interconnection. Also describe the project’s planned operating mode (e.g., combined heat and power, peak shaving, etc.), and its address or grid coordinates.
- Install Reqs
"All distributive generation facilities must include a disconnect device between the Cooperative’s
facilities and those facilities owned by the generation facility."
- Equipment Approvals
- California Energy Commission
- Website
- link
Other details
- Restrict Inspection
- 0
- Address ID
- 272909
- Express Planset Eligible
- Yes