Village of Rantoul Light & Water Utilities

Illinois Utility Interconnection & net metering rules
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
0
TOU Utility
0
Post Solar Billing Method
Export Rate
Solar Export Type
Avoided Cost
Net Excess Generation Notes

Energy generated by the customer-owned generator during the billing period may supply all or a portion of the energy required by the customer’s load. The customer shall be credited for excess energy delivered by the customer to Village at the meter from the approved on-site generating facility. A credit shall be created and applied to the customer's bill based upon the lesser or the retail rate and the avoided cost. The Village shall carry over any unused credits earned and apply those credits to subsequent billing periods to offset usage based electric energy (kWh) charges only for electric energy supplied to the customer by the Village until all credits are used or until the end of the annual period. The annual period shall end each year on April 30. 

Rebates Offered
1
Deregulated
0
Allows Standby
0

Interconnection & taps

Approval Req To Install
No
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
0

System size & offset

System Size Restrictions
125
System Size Restriction Type
Percent
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
System Offset Notes

125% of the prior year’s annual kWh consumption or 25 kW AC (whichever is less)

Offset Calc Tool
Historical Usage

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
AC Disconnect Required
Yes
AC Disconnect Labeling
Utility Disconnect Switch
Meter Spot Required
0

Plans & docs

Site Plan Reqs

Standard

SLD Reqs

Standard

Electric Service Reqs

All interconnections shall comply with codes established by National Electrical Code (NEC), National Electrical Safety Code (NESC), Institute of Electrical and Electronics Engineers (IEEE)(particularly IEEE 1547), and Underwriters Laboratories (UL)

Electrical Stamp Required
0
Equipment Approvals
California Energy Commission
Meter Num Req SLD 3LD
0
ESID Num Req SLD 3LD
0
Rate Schedule Link
link
Website
link
Phone
(217) 892-6800

Other details

Restrict Inspection
0
Revision Required
1
Mod Swap Requires Planset
1
Address ID
7849384
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Village of Rantoul Light & Water Utilities before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.