Western Illinois Elec Coop
Net Metering Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Solar Export Rate Approx
- 0.03
- Solar Export Value Notes
- Changes monthly/annually or as needed
- Net Excess Generation Notes
With Net Billing, members using a renewable energy system first utilize their generated power at their location, getting full retail value for those generated kilowatt-hours (kWh). Any time the renewable energy system is producing more energy than the location is using, the excess energy is sent to WIEC electric grid. At the end of the month, WIEC pays the member for that excess energy at our on-peak wholesale energy rate which is set annually by Prairie Power Inc. (Current rate: $0.03 / kWh)
- Rebates Offered
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 100
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Inverter Oversize Restrictions
- 0
- System Offset Notes
100 kW AC or 110% offset of their historical usage, whichever is less
- If 12 months of data is not available, the average amount of energy may be reasonably estimated by the Cooperative
- The utility will inform the customer when they meet up with them what the maximum system size is allowable
Customers with electrical heating is not able to move forward with Solar. Please have the customer contact the utility. (Rates 40, 41, 403 and 413)
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
Plans & docs
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Rate Schedule Link
- link
- Website
- link
- Phone
- (800) 576-3125
Other details
- Restrict Inspection
- 0
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Address ID
- 6802116
- Express Planset Eligible
- Yes