Evergy Kansas
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
Energy exported to Evergy and power supplied by Evergy is monitored through a bi-directional meter. Through one-for-one net metering, exported energy is used to offset an equal amount of power supplied by Evergy during the billing period. Excess energy is credited the avoided cost.
- Rebates Offered
- 0
- Deregulated
- 0
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Tap Criteria
Review the POC with Tap Box and without Tap Box Diagrams uploaded to the files section
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Restrictions
- 15
- System Size Restriction Type
- AC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Customers generator shall be sized to offset part, or all, of the customer generators own electrical requirements.
15kW AC is the max for residential system to be eligible for Net Metering.
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- Tesla Backup Switch,ConnectDER
Plans & docs
- Site Plan Reqs
The plan or map must identify the location of the source of generation, any existing generation, energy storage, associated meters, production meter, and solar disconnect.
- SLD Reqs
Diagrams should include: resource type, existing generation, storage devices, inverters, load center, production meter, disconnect switch, and revenue meter.
- Install Reqs
Disconnect Required
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (816) 242-5971
Other details
- Revision Required
- 1
- Mod Swap Requires Planset
- 1
- Express Planset Eligible
- No