Flint Hills Rural ECA
Net metering & export
- Net Metering Allowed
- 1
- NEM Type
- Monthly
- TOU Utility
- 0
- Post Solar Billing Method
- Net Metering
- Net Excess Generation Notes
To the extent the net consumption is negative (i.e. Customer-generator produced more kWh during the billing period than the Cooperative supplied), the Customer-generator will pay applicable Customer Charges, Demand Charges, and/or any Minimum Charges that would otherwise be applicable to the Customer under the standard rate; and the excess electric energy shall be retained by the supplier as a contribution to fixed costs associated with owning and maintaining the facilities required to provide electric service when the Customer-generator cannot meet its own supply needs
- Rebates Offered
- 0
- Deregulated
- 1
- Allows Standby
- 0
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 0
System size & offset
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Per utility regarding 12 months consumption history
"If a prospective customer is not able to provide you with his 12-month usage history, I would recommend that you contact me to calculate the appropriate sizing per our formula to save you from doing all the work to send the application and plans for a system that is larger than we will approve for interconnection. We do have some line sections that have reached the maximum interconnection and no further interconnection is allowed, so that’s something else that I can check proactively."
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
The one-line diagram must contain a manual disconnect and a production side meter.
- Electric Service Reqs
Review Attachment 3 - Certification Codes and Standards uploaded to the files
- Install Reqs
AC Disconnect Required
Production Meter Socket Required (Utility installs the meter at PTO inspection)
- Placards
No additional requirements beyond NEC code
- Electrical Stamp Required
- 0
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
Other details
- Express Planset Eligible
- No