Report a correctionNet metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- Allowed Meter Adapter
- None
Plans & docs
- SLD Reqs
- Electric Service Reqs
The Customer shall furnish and have installed, if not alreadyin place, the necessary meter socket and wiring in accordance with all applicable safety andelectrical standards. The Customer shall have installed a second meter socket and necessarywiring between the output of the Facility and the Customer’s main electrical service. The metersocket shall be located outside of a location approved by the Electric Division. The secondmeter socket shall be supplied by the Electric Division at the Customer’s expense. TheCustomer shall supply a safety disconnect switch adjacent to the Electric Division’s meteringequipment that is accessible by the Electric Division at all times.
- Website
- link
- Phone