Norwood Electric Department
Net Metering Allowed0
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed0
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- 0
- TOU Utility
- 0
- Post Solar Billing Method
- Feed-in-Tariff
- Solar Export Type
- Other
- Solar Export Value Notes
- $0.075 for all kWh
- Net Excess Generation Notes
All electricity generated by the Customer’s generation equipment shall be purchased by NMLD.
- Rebates Offered
- 1
- Deregulated
- 1
Interconnection & taps
- Approval Req To Install
- Yes
- Interconnection Level
- 3
- Supply Side Taps Allowed
- 0
- Line Taps Allowed
- 0
- Load Taps Allowed
- 0
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- 1
System size & offset
- System Size Restrictions
- 25
- System Size Restriction Type
- DC kW
- System Size Battery Included
- 0
- System Size Includes Existing Systems
- 0
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-PM-Disco-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Utility Disconnect Switch
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- AC disconnect must be accessible to the utility 24/7. The switch shall be located outdoors and easily accessible to Department personnel at all times.
- Azimuth must be between 90 and 270 degrees
- As measured by Solar Access Value, the expected output will be reduced by no more than 20% due to shading.
- The analysis must include the azimuth, system tilt, and shading for each plane that will host PV panels.
- System must include the installation of the LocusNOC meter in addition to the Participating MLP’s production meter
- SLD Reqs
- AC disconnect: switch shall be gang operated, have a visible break when open
- System must include the installation of the LocusNOC meter in addition to the Participating MLP’s production meter
- A sample line diagram is available in the database Files section
- Install Reqs
- The PV project electrical work must be performed by a Massachusetts licensed electrician.
- The PV project must be installed according to the manufacturer’s instructions and in compliance with all applicable codes and standards including:
- Local, state, and/or federal building and electrical laws, codes and practices.
- All pertinent permits and inspections must be obtained, and copies kept on file as may be required by local codes and/or state law.
- System must include installation of the LocusNOC meter in addition to the Participating MLP’s production meter.
- The utility must be aware of the install date so they can attend the installation and confirm the plans being used are the ones they approved.
- Meter Num Req SLD 3LD
- 0
- ESID Num Req SLD 3LD
- 0
- Website
- link
- Phone
- (781) 948-1100
Other details
- Restrict Inspection
- 0
- Revision Required
- 0
- Mod Swap Requires Planset
- 1
- Address ID
- 1348710
- Express Planset Eligible
- No