Princeton Municipal Light Department
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- TOU Utility
- No
- Post Solar Billing Method
- Export Rate
- Solar Export Type
- Avoided Cost
- Net Excess Generation Notes
PMLD will credit the solar owner’s account in dollars ($) on a monthly basis for the avoided cost for exported power. PMLD will round the consumed power up to 200 kWh per month minimum should actual consumption be less. Any annual net credit greater than $25 can be requested by check each April for the previous April through March time period. Net credits not claimed by April 30 will be applied to the Town of Princeton’s electric bill.
- Rebates Offered
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Tap Criteria
Line Side Tap allowed per NEC
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- No
System size & offset
- System Size Restrictions
- 30
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- Combination
- Offset Value
- 100
- Offset Calculation Basis
- Historical
- Offset Calculation Period
- 12
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- Historical Usage
Metering & disconnect
- Production Meter Required
- No
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
Standard
- SLD Reqs
Standard, PE stamp required
- Electric Service Reqs
Systems 30kW or Less:
- PMLD will require an external disconnect switch at the PCC
- Must be gang operated, have a visible break when open.
- Placards
- All meter enclosures shall have a red plastic placard with white embossed writing attached by rivets either directly above or below the meter.
- The embossed wording will be "Caution, Interconnected Generator".
- The attached placard will be a minimum of 1 1/2" high and 3" wide.
- The placard will be provided by PMLD to the customer/installer and be properly installed prior to PMLD's final witness test and approval.
- Electrical Stamp Required
- Yes
- Equipment Approvals
- California Energy Commission
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Website
- link
- Phone
- (978) 464-2815
Other details
- Mod Swap Requires Planset
- Yes