Report a correction Net Metering AllowedYes
NEM TypeMonthly
Supply Side Taps AllowedNo
Line Taps AllowedNo
Load Taps AllowedNo
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Monthly
- TOU Utility
- No
- Post Solar Billing Method
- Net Metering
- Rebates Offered
- No
- Deregulated
- No
Interconnection & taps
- Approval Req To Install
- Yes
- Supply Side Taps Allowed
- No
- Line Taps Allowed
- No
- Load Taps Allowed
- No
- Tap Criteria
- Load or Line side taps are not acceptable within the utility meter socket.
- Automatic Transformer Upgrade Size
- 0
System size & offset
- System Size Restrictions
- 10
- System Size Restriction Type
- AC kW
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- System Offset Notes
Metering & disconnect
- Production Meter Required
- Yes
- Production Meter Position
- Inv-Disco-PM-POI
- Production Meter Labeling
- Production Meter
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
- The disconnect must be in a readily accessible location, visible from the SELCO meters, for utility access.
- Install an external whole-house emergency disconnect between the revenue meter and main panel if one does not already exist.
- SLD Reqs
Meter Orientation = Over/Under
- Include all system devices, wire sizes, equipment ratings, and a visible, lockable disconnect switch.
- Wire the production meter socket with the PV output to the top (line side) building load to the bottom (load side).
- Install an external whole-house emergency disconnect between the revenue meter and main panel if one does not already exist.
- Electric Service Reqs
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- No
- ESID Num Req SLD 3LD
- No
- Rate Schedule Link
- link
- Website
- link
- Phone
- (508) 841-8500