Net Metering AllowedYes
NEM TypeAnnual
Supply Side Taps AllowedYes
Line Taps AllowedYes
Load Taps AllowedYes

Net metering & export

Net Metering Allowed
Yes
NEM Type
Annual
TOU Utility
No
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

The Company will carry forward negative kilowatt-hours until the Customer’s consumption of electricity from the grid eliminates the Excess Generation or until the end of the billing cycle that is completed immediately prior to the end of April of each year. For Customers served under Standard Offer Service, the dollar value of Excess Generation shall be equal to the Supply Capacity, Energy and Ancillary Rates portion of the rate that the Customer would have been charged averaged over the previous twelve-month period ending with the billing cycle that is complete immediately prior to the end of April multiplied by the number of kilowatt-hours of Excess Generation. For Customers served by alternate suppliers of electricity supply service, the dollar value of Excess Generation shall be equal to the electricity supply service portion of the rate that the Customer-generator would have been charged by the electricity supplier, if that rate is known by the Company, multiplied by the number of kilowatt-hours of Excess Generation.

Rebates Offered
Yes
Deregulated
Yes
Allows Standby
Yes

Interconnection & taps

Approval Req To Install
Yes
Supply Side Taps Allowed
Yes
Line Taps Allowed
Yes
Load Taps Allowed
Yes
Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
Yes

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
No
System Size Includes Existing Systems
No
Offset Type
Percentage
Offset Value
200
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Renewable energy-generating systems can be sized to meet up to 200% of your 12-month historical energy consumption.


Capacity map:

https://pepco.maps.arcgis.com/apps/webappviewer/index.html?id=98f9fa754c3d4cddaee45bb5d4612549

https://decoop.maps.arcgis.com/apps/webappviewer/index.html?id=7bc9ccbded894fac8d304d79eaa4edb6

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

Site Plan Reqs

Delmarva (DE) Green Energy Program is for Delmarva Power customers in the state of Delaware only.

Website
link
Phone
(866) 634-5571
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Delmarva Power (MD) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.