Hagerstown Light Department

Maryland Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Line Taps Allowed0
Load Taps Allowed0

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Net Excess Generation shall accrue over an Accrual Period of 12 months ending with the billing period that occurs immediately prior to the end of April. The Company shall take ownership of the Net Excess Generation and carry forward the excess on the Customer’s bill until the excess has been used by the Customer in subsequent billing periods or the Accrual Period expires.

Rebates Offered
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Line Taps Allowed
0
Load Taps Allowed
0
Automatic Transformer Upgrade Size
0

System size & offset

System Size Restrictions
0
System Size Restriction Type
No Restrictions
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
Percentage
Offset Value
100
Offset Calculation Basis
Historical
Offset Calculation Period
12
Industry Standard Watts Sqft
2
System Offset Notes

Not to exceed 200% of the Customer’s annual baseline usage.

Metering & disconnect

Production Meter Required
No
Production Meter Position
N/A
Production Meter Labeling
N/A
Allowed Meter Adapter
None

Plans & docs

SLD Reqs

This utility requires the line diagrams to be stamped and cannot have the verbiage "STRUCTURAL ONLY"

Electrical Stamp Required
1
Electrical Diagram Notes


Website
link
Phone
(301) 790-4160

Other details

Restrict Inspection
0
Address ID
170591
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Hagerstown Light Department before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.