CMP - Central Maine Power
Spot something wrong?
Tariffs and interconnection rules move often. If something here is out of date or missing, tell us and we'll fix it.
Report a correction Net Metering AllowedYes
NEM TypeAnnual
Line Taps AllowedYes
Load Taps AllowedYes
AC Disconnect RequiredYes
Net metering & export
- Net Metering Allowed
- Yes
- NEM Type
- Annual
- TOU Utility
- Yes
- Post Solar Billing Method
- Net Metering
- Solar Export Type
- N/A
- Net Excess Generation Notes
If the electricity generated during the billing period by the eligible facility plus any kilowatt-hour credits from prior billing periods exceed the customer's or the shared financial interest customers’ kilowatt-hour usage during the billing period, the excess shall be applied to the customer's bill or the shared financial interest customers’ bills for the following billing period as a reduction in the customer's kilowatt-hour usage.
- Rebates Offered
- No
- Deregulated
- Yes
- Allows Standby
- Yes
Interconnection & taps
- Approval Req To Install
- Yes
- Line Taps Allowed
- Yes
- Load Taps Allowed
- Yes
- Tap Criteria
- Branch preference: If the house has Meter Main, load side tap vs breaker tie in in the MSP inside the house.
- Automatic Transformer Upgrade Size
- 0
- Meter Aggregation Allowed
- Yes
System size & offset
- System Size Restrictions
- 0
- System Size Restriction Type
- No Restrictions
- System Size Battery Included
- No
- System Size Includes Existing Systems
- No
- Offset Type
- No Restrictions
- Offset Value
- 0
- Offset Calculation Period
- 0
- Industry Standard Watts Sqft
- 2
- Offset Calc Tool
- N/A
Metering & disconnect
- Production Meter Required
- No
- Production Meter Position
- N/A
- Production Meter Labeling
- N/A
- AC Disconnect Required
- Yes
- AC Disconnect Labeling
- Visible Lockable Labeled Disconnect
- Meter Spot Required
- No
- Allowed Meter Adapter
- None
Plans & docs
- Site Plan Reqs
All Jobs:
- PORTRAIT HIGHLY PREFERRED FOR ALL PROJECTS (EXCEPT CASH/MOSAIC ON COMP SHINGLE)
- 8 MODS PER STRING MINIMUM; 15 MAXIMUM
- SLD Reqs
- Line Diagram (Level 2-4 must be PE stamped, level 2 is 25kW - 2MW)
- Electrical Stamp Required
- No
- Meter Num Req SLD 3LD
- Yes
- ESID Num Req SLD 3LD
- No
- Site Plan Notes
- Electrical Diagram Notes
- Website
- link
Other details
- Revision Required
- Yes
- Mod Swap Requires Planset
- Yes