Versant Power (ME)

Maine Utility Interconnection & net metering rules
Net Metering Allowed1
NEM TypeAnnual
Supply Side Taps Allowed0
Line Taps Allowed0
Load Taps Allowed1
AC Disconnect RequiredYes

Net metering & export

Net Metering Allowed
1
NEM Type
Annual
TOU Utility
0
Post Solar Billing Method
Net Metering
Net Excess Generation Notes

Customers may accumulate unused kilowatt-hour credits and apply them against kilowatt-hour usage or total bill charges on a rolling 12-month basis. At the end of each 12-month period, any accumulated unused kilowatt-hour or dollar credits shall be eliminated and may not be applied against any future kilowatt-hour usage or bill charges. The customer will receive no compensation for unused credits.

Rebates Offered
0
Allows Standby
1

Interconnection & taps

Approval Req To Install
Yes
Interconnection Level
3
Supply Side Taps Allowed
0
Line Taps Allowed
0
Load Taps Allowed
1
Tap Criteria

Line Side Taps are not permitted

POI Hierarchy

BREAKER

LOAD SIDE TAP

DERATE

MPU

Automatic Transformer Upgrade Size
0
Meter Aggregation Allowed
1

System size & offset

System Size Restrictions
25
System Size Restriction Type
AC kW
System Size Battery Included
0
System Size Includes Existing Systems
0
Offset Type
No Restrictions
Offset Value
0
Offset Calculation Period
0
Industry Standard Watts Sqft
2
Utility Specific Adjustments


System Offset Notes

25 kW AC MAX (for Residential LVL 1)

Metering & disconnect

Production Meter Required
No
AC Disconnect Required
Yes
Allowed Meter Adapter
Tesla Backup Switch

Plans & docs

Site Plan Reqs


SLD Reqs
  • Total system size including existing systems must be outlined on SLD and Site Plan for ex. TOTAL SYSTEM SIZE: AC: 5kW (Existing) + 3.8kW (New) = 8.8kW AC DC: 5.67 (Existing) + 2.835 ( New) = 8.505kW DC
  • Do not split 15 mod system into 7/8 stings. Use 15 mods on a single string
  • Inverter models must match the specification sheet on plans, also specification sheet must specify UL1741 SB. Example: Adjust the inverter model name from SOLAREDGE SE6000H-USRGM [SI1] to SOLAREDGE SE6000H-US to be consistent with provided inverter datasheet.
  • Please ensure plans show max continuous output
  • Include meter number on ELD. See files section for Meter Number Example to see what number should be added.
  • Meter number required on title block + single line diagram. Site capture should have picture of meter + closeup of number.
  • The AC Disconnect needs a note that it is utility accessible.

Battery Projects

  • A note for the gateway needs to state operation mode. Ex: “Self Consumption Mode”
  • A note for the battery needs to state operation mode: Ex: “Self Consumption Mode” and “PV ONLY EXPORT MODE and CHARGES FROM PV ONLY”.
Electric Service Reqs


Meter Num Req SLD 3LD
1
Site Plan Notes


Website
link
Phone
(855) 363-7211

Other details

Restrict Inspection
1
Revision Required
1
Mod Swap Requires Planset
1
Address ID
1050503
Express Planset Eligible
Yes
Compiled from public records, 2026. Tariffs and interconnection rules change; verify with Versant Power (ME) before you rely on this. The useful move: if an installer says you need a main panel upgrade, ask how these tap and interconnection policies were considered first.